Tag: moved

  • Webb moved for fueling #shorts

    Webb moved for fueling #shorts

    The James Webb Space Telescope, configured for flight, was moved from the cleanroom to the payload preparation facility for fuelling at Europe’s Spaceport in French Guiana on 11–12 November 2021.

    Webb will be loaded with propellants before being mounted on top of the rocket and then encapsulated by the Ariane 5 fairing.

    Webb will be the largest, most powerful telescope ever launched into space. As part of an international collaboration agreement, ESA is providing the telescope’s launch service using the Ariane 5 launch vehicle. Working with partners, ESA was responsible for the development and qualification of Ariane 5 adaptations for the Webb mission and for the procurement of the launch service by Arianespace.

    Webb is an international partnership between @NASA , ESA and the @Canadian Space Agency.

    Find out more about Webb in ESA’s launch kit: https://bit.ly/ESAWebbToolKit

    Copyright: ESA / @CNES / @arianespace

    ★ Subscribe: http://bit.ly/ESAsubscribe and click twice on the bell button to receive our notifications.

    Check out our full video catalog: http://bit.ly/SpaceInVideos
    Follow us on Twitter: http://bit.ly/ESAonTwitter
    On Facebook: http://bit.ly/ESAonFacebook
    On Instagram: http://bit.ly/ESAonInstagram
    On LinkedIn: https://bit.ly/ESAonLinkedIn
    On Pinterest: https://bit.ly/ESAonPinterest
    On Flickr: http://bit.ly/ESAonFlickr

    We are Europe’s gateway to space. Our mission is to shape the development of Europe’s space capability and ensure that investment in space continues to deliver benefits to the citizens of Europe and the world. Check out https://www.esa.int/ to get up to speed on everything space related.

    Copyright information about our videos is available here: https://www.esa.int/ESA_Multimedia/Terms_and_Conditions

    #ESA
    #Webb
    #WebbFliesAriane

  • NASA’s Mobile Launcher Moved to Launch Pad

    NASA’s Mobile Launcher Moved to Launch Pad

    The mobile launcher that’ll support NASA’s Space Launch System (SLS) has moved from the Vehicle Assembly Building to Launch Pad 39B at the Kennedy Space Center in Florida. The 355-foot-tall ML, which took about two years to construct, is
    being modified to support the heavy-lift rocket that will launch astronauts farther into space than ever before. SLS also will create high-quality jobs here at home, and provide the cornerstone for America’s future human space exploration efforts.